Carbon Crystal Panel Modular Partition Wall Type Two
Wall Thickness Specifications:58mm/88mm/120mm






Comparison Between Traditional vs. Speed-Installation Wall Systems
Efficiency & Standards
Speed-Installation Wall System:
– Factory-produced modular panels (pre-installed with wiring)
– “Lego-style” rapid assembly
– Fully standardized process
Key Advantages of Speed-Installation:
– Saves labor
– Faster installation
– Consistent quality
Traditional Wall System:
– On-site cutting of steel studs, gypsum boards
– Piping installation
– Plastering, sanding, painting
– Labor-intensive and time-consuming
Wall Strength
Speed-Installation Wall System:
– Steel studs + honeycomb core structure
– Bonded with PUR adhesive under high temperatures
– Enhanced load-bearing capacity
Key Advantages of Speed-Installation:
– Higher structural strength
– Better impact resistance
Traditional Wall System:
– Only steel studs bear load
– Rock wool insulation provides no structural support
– Average impact resistance
Color & Stain Resistance
Speed-Installation Wall System:
– Multiple color options with high-temperature lamination
– Waterproof, moisture-resistant
– Anti-stain coating
Key Advantages of Speed-Installation:
– Aesthetic versatility
– Easy maintenance
– Durable finish
Traditional Wall System:
– Limited color options
– Painted surfaces prone to stains
– No waterproofing
Reusability & Eco-friendliness
Speed-Installation Wall System:
– Demountable design
– Supports recycling/reuse
– Zero formaldehyde, dust-free
Key Advantages of Speed-Installation:
– Sustainable construction
– Reduced environmental impact
Traditional Wall System:
– Non-recyclable
– Demolition generates construction waste
– Dust pollution during removal